Futuristic EV charging station at night with electric blue neon light strips
Global Expansion 2024

Powering the Future of Mobility.

Join EVST in scaling the world's most intelligent ultra-fast charging network. Invest in high-yield infrastructure built for the next generation of electric transportation.

Why Invest?

The transition to electric is no longer a trend—it's an inevitability. EVST secures high-demand locations before the curve.

location_on

Prime Real Estate

We utilize AI-driven spatial analysis to secure land in high-traffic urban corridors where charging demand exceeds supply by 300%.

bolt

Proprietary Tech

Our Grid-Flex technology allows our stations to store energy during off-peak hours, maximizing profit margins on every kilowatt delivered.

trending_up

Proven Scalability

With 45 active locations and a pipeline of 200+ globally, our model is modular, repeatable, and designed for rapid capital deployment.

The Investment Model

01

Asset Tokenization

Investors can buy fractional ownership in specific charging hubs, allowing for diversified portfolios across different geographic regions.

02

Revenue Sharing

Receive monthly distributions from charging fees, advertising revenue on station displays, and energy arbitrage profits.

03

Equity Upside

Long-term capital appreciation as the EVST global network expands and becomes the backbone of the renewable energy grid.

Abstract financial growth graph with electric blue lines on dark background

Projected Returns

Annual Yield

0.0%

Target IRR

0.0%

Payback Period

0.0 yr

Asset Life

0+ yr

Cumulative Return Forecast

EVST Model
Traditional S&P
Year 1Year 2Year 3Year 4Year 5Year 6

Strategic Locations

View Map open_in_new
Toronto Waterfront District

Toronto Waterfront District

High Density Residential & Commercial

Occupancy

88%

Vancouver Hwy 1 Corridor

Vancouver Hwy 1 Corridor

Main Arterial Logistics Hub

Cap Rate

14.2%

Montreal Central Hub

Montreal Central Hub

Mixed Use Commercial Plaza

Demand Gap

Critical

Ready to lead the energy transition?

Limited capacity available for the Q4 Infrastructure Fund. Secure your allocation today.

Past performance is not indicative of future results. Please read the full prospectus.